House - "Isgrev" villa resort, Balchik area
Choose a facade-color:
FOR SALE!
2 Houses - "Isgrev" villa resort , Balchik area

3 km away from Albena
6 km away from Balchik
A unique view to the sea
Prise for a single house - € 153 000
Both houses have the same architecture
A € 4000 discount from the total price when purchasing both houses!
Current building stage - finishing work
Technical summary of the houses:
Characteristics and special features House 1 House 2
Basic price € 153 000 € 153 000
Built-up area 60 sq.m. 60 sq.m.
Unfolded built-up area 130 sq.m. 130 sq.m.
Adjoining area 210 sq.m. 210 sq.m.
Garage yes - 23 sq.m.
Parking spot
SOT/Alarm and security equipment/
Planting around the house will be provided will be provided
Possibilities for making a mini-pool
First floor.
Quadrature 60 sq.m. 60 sq.m.
Rooms on first floor.
Wide area - living-room with a dining-room
Kitchen with kitchen furniture
A chimney will be build
Bathroom
Lumber room
Second floor .
Quadrature 70 sq.m. 70 sq.m.
Rooms on second floor.
Number of bedrooms 3 3
Number of bathrooms 2 2
Big terrace
Access to the terrace from all bedrooms from all bedrooms
Additional information, referring to both houses:
  • - luxurious flooring and plaster;
  • - ceilings with hidden lightning;
  • - staircase parapet made from wrought iron;
  • - alluminium windows/doors;
  • - regulated lightning;
  • - an incredible view towards the sea.
Prices. Stages. Additional agreements.
1. When signing a preliminary contract, 30-50% from the basic price ( € 153 000 ) of the house is being paid.
2. In a time limit of 60 days after signing the preliminary contract the finishing works will be done.
3. After the 60 days time limit has expired, a final contract is being signed, by the signing of which the rest of the amount is being paid and the formalities relating the sale are being certified at the notary's office.
4. The house in its final construction stage is given to the owner who recieves a notarial act.
*** If additional work is being done (the building of a pool, special barbecue place) the price will be reviewed.
*** If additional work is being done, the 60 day time limit until the final construction stage of the house will also be reviewed.